CITY OF CAMERON
100 S. Houston Avenue, P. O. Box 833 254-697-6646
Cameron, Texas 76520 254-697-3040 Fax
Public Notice for the
Cameron Water Distribution Improvements – Phase II
Project is Wholly Funded by the Drinking Water State Revolving Fund (DWSRF) thru the Texas Water Development Board (TWDB)
Description of Project:
- Installation of approximately 7,590 linear feet of 1.5”, 2” and 6” PVC waterlines with accompanying fittings along 5 roadway corridors in the City of Cameron.
- Install approximately 17 – 2”, 4” and 6” Gate Valves by Open-Cut, 13 – 1.5”, 2” 6”, 8” and 10” Gate Valves by Hot Tap, 14 Standard Fire Hydrant Assemblies.
- Transfer 53 existing water services to new lines.
- Removal and Replacement of 555 existing meters
- Sawcut Existing Roadways along proposed trench and install 2-Course Chip Seal with 12” of Crushed Limestone Base for trench width.