News Flash Home
The original item was published from 4/7/2022 9:04:00 AM to 5/21/2022 12:00:07 AM.
News Flash
Water/Wastewater System
Posted on: April 7, 2022[ARCHIVED] Public Notice

Public Notice for the
Water Distributions Improvements – Phase 4
TWDB No. 62695, CID 06
Project is Wholly Funded by the Drinking Water State Revolving Fund (DWSRF) thru the Texas Water Development Board (TWDB)
Description of Project:
- Furnish and Install New 6” PVC Waterline along Colfax Avenue including gate valves, fire hydrants, connection to existing distribution and service lines from West Batte Street to Highway 190.
- Replace and Abandon in Place Existing Waterlines along Colfax Avenue.
- Tie-in to Existing Waterlines at Batte Street, Main Street, and near Highway 190.
- Exploratory Excavation on Existing 6” Waterline near Highway 190.
- Surface Repair within Right-of-Way.