Water Distribution Improvements – Phase II

Project is Wholly Funded by the Drinking Water State Revolving Fund (DWSRF) thru the Texas Water Development Board (TWDB)

Description of Project:

  • Furnish and Install 6,980 LF of 6” Diameter C900 DR18 Waterline Along Gillis, Houston, 3rd Street, Adams and Crockett Avenues. 
  • Furnish and Install 2,458 LF of 1”- 2” Diameter Sch. 40 waterlines to replace existing service lines. 
  • Furnish and Install 80 LF 12” Diameter Steel Encasement by Open Cut.
  • Furnish and Install 17 Each of 2”- 8” Diameter Gate Valves by Open Cut Method.
  • Furnish and Install 15 Each of 1.5”- 10” Diameter Gate Valves by Hot Tap Method.
  • Furnish & Install 4 Each of 6”-10” Line Stops by Hot Tap Method.
  • Furnish & Install 14 Each of Standard Fire Hydrant Assemblies.
  • Connection of 53 Existing Water Distribution Services to New Infrastructure.
  • Remove and Replace 550 Existing Water Meters.    
  • Replace 6,000 SY of Asphalt within Trench lines where Saw cut of Existing Roadways or Driveways is Necessary.