News Flash Home
The original item was published from 6/24/2020 11:17:28 AM to 6/24/2020 11:21:31 AM.

News Flash

Water/Wastewater System

Posted on: June 24, 2020

[ARCHIVED] Water Distribution Improvements - Phase II

CityLetterhead




Public Notice for the

Water Distribution Improvements – Phase II

Project is Wholly Funded by the Drinking Water State Revolving Fund (DWSRF) thru the Texas Water Development Board (TWDB)

Description of Project:

•    Furnish and Install 6,980 LF of 6” Diameter C900 DR18 Waterline Along Gillis, Houston, 3rd Street, Adams and Crockett Avenues. 

•    Furnish and Install 2,458 LF of 1”- 2” Diameter Sch. 40 waterlines to replace existing service lines. 

•    Furnish and Install 80 LF 12” Diameter Steel Encasement by Open Cut.

•    Furnish and Install 17 Each of 2”- 8” Diameter Gate Valves by Open Cut Method.

•    Furnish and Install 15 Each of 1.5”- 10” Diameter Gate Valves by Hot Tap Method.

•    Furnish & Install 4 Each of 6”-10” Line Stops by Hot Tap Method.

•    Furnish & Install 14 Each of Standard Fire Hydrant Assemblies.

•    Connection of 53 Existing Water Distribution Services to New Infrastructure.

•    Remove and Replace 550 Existing Water Meters.    

•    Replace 6,000 SY of Asphalt within Trench lines where Saw cut of Existing Roadways or Driveways is Necessary.


Facebook Twitter Email

Other News in Water/Wastewater System

TWD DWSRF Project 62695

Posted on: September 22, 2023

TWD DWSRF Project #62695

Posted on: September 22, 2023