News Flash Home
The original item was published from 6/23/2020 9:15:12 AM to 7/8/2020 12:00:05 AM.

News Flash

Water/Wastewater System

Posted on: June 23, 2020

[ARCHIVED] Cameron Water Distribution Improvements - Phase III

CityLetterhead



Public Notice for the

Cameron Water Distribution Improvements – Phase III

Ground Storage Pump Modifications

Project is Wholly Funded by the Drinking Water State Revolving Fund (DWSRF) thru the Texas Water Development Board (TWDB)

Description of Project:

  • Installation of One (1) Variable Frequency Drive for Existing Vertical Turbine Pumps including Electrical Conduit Modifications, Instrumentation, Control Panels, Modifications to Existing Buildings, Removal and Disposal of Existing Electrical Components
  • Installation and Coordination with Oncor Electric for New Service Drop at Ground Storage Facility. 
  • Site Preparation and Cleanup at Ground Storage Facility


Facebook Twitter Email

Other News in Water/Wastewater System

TWD DWSRF Project 62695

Posted on: September 22, 2023

TWD DWSRF Project #62695

Posted on: September 22, 2023