Posted on: June 12, 2020[ARCHIVED] Cameron Lift Station Rehabilitation – Phase I

Public Notice for the
Cameron Lift Station Rehabilitation – Phase I
Project is Wholly Funded by the Clean Water State Revolving Fund (CWSRF) thru
the Texas Water Development Board (TWDB)
Description of Project:
- Replacement or Rehabilitation of Eight (8) existing lift stations within the City of Cameron including replacement of all pumps, discharge piping, valves, electrical panels and appurtenances at each site.
- Furnish and Install six (6) new concrete valve vaults with new 4”/6” ductile iron piping, gate valves, check valves, air and vacuum combination valves and additional appurtenances.
- Rehabilitate two (2) existing valve vaults to replace gate valves, check valves and installation of new air and vacuum combination valve.
- Sawcut Existing Roadways or Driveways where necessary to allow for Wet Well or Valve Vault installation.